Cooling Tower Replacement
CORE MARKET: Mission Critical
Replacement of the cooling tower for a key tenant of RTP. The project tackled logistical challenges by developing a comprehensive delivery and logistics plan for removing the old cooling tower and delivering the new one. The scope of work involved reconfiguring the existing piping, installing a new VFD and electrical infrastructure, and making modifications to the current structure. The project team executed several method-of-procedure plans to manage critical shutdowns and tie-ins. The team's diligent collaboration with the facilities team ensured zero unplanned interruptions. Highlights included an onsite temporary pre-fabrication shop to speed up the installation process.